The "invisible shackles" under the soaring computing power: enterprises are in a dilemma
In 2025, the scale of China's intelligent computing power will exceed 1,000EFLOPS, and the demand for computing power in scenarios such as AI large model training and real-time data analysis will increase exponentially. However, while enterprises enjoy the computing power dividend, they have to face two "invisible shackles":
- Data sovereignty is out of control: In public cloud services, enterprise data is stored on third-party platforms, facing risks such as compliance review and cross-border transmission, and a financial technology company was fined 230 million yuan for not meeting regulatory requirements in the data storage location.
- Cost black holes are difficult to fill: self-built data centers require a one-time investment of hundreds of millions of yuan, and the utilization rate of computing power fluctuates greatly, and the average annual idle rate of a manufacturing enterprise's self-built computer room is as high as 45%, and the waste of resources is shocking.
Haiwu Cloud's "Cloud Edge Station" enterprise-level localized private machine room hosting service provides a "third way" for enterprise computing power deployment with "data does not go out of the domain, computing power is used on demand, and costs can be controlled" as the core.
The three disruptive capabilities of "cloud edge station" redefine the rules of enterprise computing power custody
Data sovereignty "physical-level" guarding: from "cloud leasing" to "local private"
- Physical isolation architecture: Each enterprise has an exclusive dedicated cabinet group, which is completely isolated from the public cloud, and the data transmission is completed in the private network.
- Compliance "pre-adaptation": Before the deployment of the computer room, it has passed the level 3 and financial level security certification to meet the regulatory requirements of strict industries such as government affairs, medical care, and finance.
- Customer case: A tertiary hospital hosted core medical imaging data to the "cloud side station" to achieve zero data transmission and successfully passed the data security review of the National Health Commission.
Computing power elasticity "inductive switching": from "rigid investment" to "intelligent scaling"
- Minute-level expansion: Through modular design, it supports dynamic adjustment of the power of a single cabinet from 5kW to 100kW, and automatically calls the backup computing power pool when the AI training task is at its peak.
- Intelligent resource scheduling: The AI operation and maintenance platform monitors the business load in real time and automatically releases idle resources, and the computing power utilization rate of an e-commerce platform has increased from 58% to 92% after hosting.
- Cost comparison: Compared with self-built computer rooms, the "cloud-side station" can reduce TCO (total cost of ownership) by 40%, and there is no need to bear the risk of equipment depreciation.
Full-cycle "worry-free custody": from "single transaction" to "lifetime partner"
- Zero risk of relocation: Provide full-process services from computer room site selection, equipment deployment to off-site migration, when a multinational enterprise relocates across provinces, Haiwu Cloud takes 72 hours to complete the full computing power migration, and the business interruption time is less than 10 minutes.
- Hardware "family bucket": In addition to cabinet rental, hardware configurations such as bare metal servers, storage arrays, and network equipment can be provided simultaneously to support full-scenario requirements such as HPC, AI training, and big data analysis;
- Energy efficiency optimization package: Combined with liquid cooling and AI energy-saving algorithms, the PUE value is reduced to 1.08, and the annual electricity saving is equivalent to reducing carbon dioxide emissions by 3,000 tons.
Haiwu Cloud: Use "hard technology" to build a moat for computing power custody
Green computing power "technology lighthouse"
- Liquid cooling module: A single cabinet supports 100kW+ high-density computing power deployment, and the energy efficiency is 30% higher than that of traditional air cooling.
- Waste heat recovery system: Converting server heat dissipation into park heating, a data center has achieved annual heating cost savings of 800,000 yuan through this technology.
Global service "neural network"
- 50+ city nodes: Covering first-tier cities such as Beijing, Shanghai, Guangzhou and Shenzhen, as well as new first-tier cities such as Chengdu and Wuhan, enterprises can choose the nearest computer room location with a network latency of less than 1ms.
- 1000+ expert team: Provide 7×24-hour real-time monitoring, fault prediction, and emergency response, with SLA guarantee of 99.999% (industry average of 99.9%).
Ecological cooperation "circle of friends"
- Chip manufacturers: Cooperate with NVIDIA, Huawei Ascend, etc. to provide the latest generation of GPU computing power support;
- Cloud service providers: Connect hybrid cloud architectures with Alibaba Cloud and Tencent Cloud to achieve seamless collaboration between private computer rooms and public clouds.

The "golden formula" of enterprise computing power hosting: security× efficiency× cost = Haiwuyun's answer
In the era of computing power as productivity, enterprises need not only "computer room space", but also a trinity solution of "security base + efficiency engine + cost controller". Haiwuyun "Cloud Side Station" passed:
✅ Data sovereignty is 100% controllable | ✅ The utilization rate of computing power exceeded 90% | ✅ TCO reduced by 40%+