Liquid cooled distribution unit (CDU)
Integrated plate heat exchanger, dual circulation pump set (1+1 redundancy), intelligent constant pressure replenishment system, and multi-dimensional sensor network, achieving millisecond level precise adjustment of flow/temperature/pressure through PLC control system. Support intelligent optimization through linkage with the computer room management system, ensuring that the temperature difference of the coolant is ≤ ± 0.5 ℃, COP>100。
0interrupt
Core device 1+1 redundancy, supporting online maintenance
Value proposition
Reliable architecture

Zero interruption power supply: Dual bus power supply switching time<10ms, main control system power-off self holding (IEC 61000-4-11 certification)

Fully redundant core: N+1 redundancy for water pumps/sensors, with a fault switching delay of less than 500ms

Super anti pollution: 50 μ m high-precision filter+real-time pressure difference monitoring (blockage warning accuracy ± 5%)

Military grade anti-corrosion: The flow channel is sealed with 316L stainless steel and PTFE (acid and alkali resistant pH 2-12, corrosion rate<0.001 mm/year)

Reliable operation and maintenance

Intelligent fluid replacement system: Level fluctuation control ≤± 3% (traditional system ± 10%), operation and maintenance intervention reduced by 90%

Online hot maintenance: The water pump/power module supports blind plug replacement (single component replacement ≤ 5 minutes)

Absolute water and electricity isolation: physical separation between coolant circuit and electrical chamber (IP66 protection level)

Reliable control

Dynamic hydraulic balance: AI based flow self-regulation, temperature difference control ≤± 1.5 ℃ (ASHRAE Class A)

Triple leak prevention guarantee: pressure sudden melting (response<100ms), real-time monitoring of electrolyte conductivity (accuracy ± 0.1 μ S/cm), mechanical drip capture device (sensitivity 0.1mL/min)

Fault pre diagnosis: 8-parameter AI modeling of bearing vibration/temperature gradient, etc., with a fault prediction rate of ≥ 95%

Application scenarios
Urban Cloud Brain
Edge data center
Air cooled data center upgrade
Renovation of old computer rooms